Home | Case Studies
Case Studies
Johnston Technologies features different projects performed at some of the biggest companies in the country.
Live From Nashville
Since the global COVID pandemic began, the need for local news and information has increased dramatically. Local stations must be available for our audiences without interruption. That’s why Nashville NBC affiliate WSMV News4 recently used Johnston Technologies to complete an Uninterruptible Power Supply replacement at two sites. In early 2020, a powerful tornado ripped through […]
Project: B-Bus Build-out
Johnston Technologies recently competed a build-out at a large healthcare insurance provider in Tampa, Florida. At the time we accepted the project, the data center was already live with one Uninterruptible Power Supplies, an Automatic Transfer Switch, and a single generator. Our customer needed both a solution and a project manager to manage adding […]
Project: Battery Monitoring and Spare Parts
A multi campus client of Johnston Technologies was struggling to maintain a normal battery life in their uninterruptible power supply (UPS). The building was limited on available space, so the decision was made to set the UPS in a condensed room with no central air conditioning availability and located in a parking garage. Over […]